Laserfiche WebLink
<br />TABLE 7 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR UTAH <br /> <br />" 1/1':.- <br />;':~ I Jo,..) <br /> <br />Monitoring Level _~ Equipment Level 2 <br /> <br />00 <br />'" <br /> <br /> Mandays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> All methods 2.50 30 7'.5.0C 10 25.00 10 25.00 <br />. Subtotal 75.00 25.00 25.00 <br /> Mandays pe Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> Border or semi-controlled flooding 25.81 15 387. 15 15 387.15 15 387.15 <br /> Sprinkler or trickle 20.47 12 245.64 12 245.64 12 245.64 <br /> Furrow 25.81 3 77 .43 3 77.43 3 77.43 <br /> Subtotal 710.22 110.22 710.22 <br /> Total mandays 785.2, 735.22 735.22 <br /> cos~ pe!, Manpower cost by evaluation year <br /> mandav <br /> Total Manpower Cost $100.00 $78522 $73522 $73522 <br />