Laserfiche WebLink
<br />'" <br />o <br /> <br />.', . 11 r, I~ ..- <br />t,;~; YV'--' <br /> <br />TABLE 7 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST. FOR UTAH <br /> <br />Mo.,itoring Level _'L <br /> <br />Equipment Level _L- <br /> <br /> Mandays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> .- <br /> All methods 2.50 30 75.00 10 25.00 10 '15.00 <br />. Subtotal 75.00 25.00 25.00 <br /> Mandays pe Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites daus <br /> Border or semi-controlled flooding 10.00 15 150.00 15 150.00 15 150.00 <br /> Sprinkler or trickle 18.57 12 222.84 12 222.84 12 222.84 <br /> Furrow 10.00 3 30.00 3 30.00 3 30.00 <br /> Subtotal 402.84 402.84 402.84 <br /> Total mandays 477 . 84 427.84 427.84 <br /> cost; per Manpower cost by evaluation year <br /> mandav <br /> Total Manpower Cost $100.00 $47784 $42784 $42784 <br />