Laserfiche WebLink
<br />00 <br />00 <br /> <br />;-' :I "l ::, U' . <br />_, __ __ v I. <br /> <br />TABLE 7 <br /> <br />- MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR TT'I'AH <br /> <br />Monitoring Level ___2-- <br /> <br />Equipment Level <br /> <br /> MBndays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br />Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br />All methods 2.50 30 75.00. 10 25.00 10 25.00 <br />Subtotal 75.00 25.00 25.00 <br /> Mandays pe Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br />Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites days sites davs sites davs <br />Border or semi-controlled flooding 19.25 15 288.75 15 288.75 15 288.75 <br />Sprinkler or trickle 15.91 12 190.92 12 190.92 12 190.92 <br />Furrow 19.25 3 57.75 3 57.75 3 57.75 <br />Subtotal 537.42 537.42 537.42 <br />Total mandays 612.42 562.42 562.42 <br /> Cos~ pelf Manpower cost by evaluation year <br /> mandav <br />Total Manpower Cost $61242 $56242 $56242 <br />