Laserfiche WebLink
<br />co <br /><.n <br /> <br />TABLE 7 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR UTAH <br /> <br />'" Ii r),; 'J" <br />~.: ',~ ..J'_ \.. OJ <br /> <br />Moaitoring Level _ ~ Equipment Level 2 <br /> <br /> Mandays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> 25.00 . <br /> All methods 2.50 ,10 3 7.50 3 7.5e <br />. Subtotal 25.00 7.50 7.5e <br /> Mandays pet Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites davs <br /> Border or semi-controlled flooding 25.81 5 129.05 5 129.05 5 129.05 <br /> Sprinkler or trickle 20.47 4 81. 88 4 81. 88 4 81.88 <br /> Furrow 25.81 1 25.81 1 25.81 1 25.81 <br /> Subtotal 236.74 236.74 236.74 <br /> Total mandays 261.7. 244.44 244.44 <br /> Cosl; pe!, Manpower cost by evaluation year <br /> mandav <br /> Total Manpower Cost $100.00 $26174 $24444 $24444 <br />