Laserfiche WebLink
<br />OJ <br />-" <br /> <br />;'): i 1 r. .:; '") <br />_"~ _...0vO <br /> <br />TABLE 7 <br /> <br />- MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR UTAH <br /> <br />Monitoring Level <br /> <br />1 <br /> <br />Equipment Level <br /> <br />1 <br /> <br /> Msndays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br />Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br />All methods 2.50 ~O 25.0l 3 7.50 3 7.50 <br />Subtotal 25.00 7.50 7.50 <br /> Mandays pe Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br />Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sitps davs sites davs ~itp~ dav~ <br />Border or semi-controlled flooding 19.25 5 96.2 5 96.25 5 96.25 <br />Sprinkler or trickle 15.91 4 63.6 4 63.64 4 63.64 <br />Furrow 19.25 1 19.2 1 19.25 1 19.25 <br />Subtotal 179.1 179.14 79.14 <br />Total mandays 204.14 186.64 186.64 <br /> Cost pel;" Manpower cost by evaluation year <br /> mandav <br />Total Manpower Cost $100.00 $20414 $18664 $18664 <br />