Laserfiche WebLink
<br />00 <br />'-' <br /> <br />TABLE 6 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR Colorado <br /> <br />"'; 11 r,,~ "'j <br />t.' ',_ ~ ~"... 4 <br /> <br />Munitoring Level ~___ <br /> <br />4 <br /> <br />Equipment Level <br /> <br /> Mondays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br />Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man-. No. of Man- No. of Man- <br /> sites days sites days sites days <br />All methods 2.50 50 125.01 16 40.00 16 40.00 <br />Subtotal 125.0C 40.00 40.00 <br /> Mandays pel Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br />Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br />Border or semi-controlled flooding 5.95 6 35.71 6 35.70 6 35.70 <br />Sprinkler or trickle 10.06 5 90.31 5 90.30 5 90.30 <br />Furrow 5.95 39 232.0: 39 232.05 39 32.05 <br />Subtotal 358.0 358.05 58.05 <br />Total mandays 483.05 398.05 398.05 <br /> Cos~ pe~ Manpower cost by evaluation year <br /> mandav <br />Total Manpower Cost $100.00 $48305 $39805 $39805 <br />