Laserfiche WebLink
<br />{' .' i- ..... (" <br />I) :.1 1 J IJ U <br /> <br />TABLE 7 - MANDAY REQUIREMENTS FOR EACH EVALUATION YEAR BY <br />MONITORING LEVEL AND EQUIPMENT LEVEL WITH ASSOCIATED <br />MANPOWER COST FOR UTAH <br /> <br />Monitoring Level <br /> <br />1 <br /> <br />Equipment Level <br /> <br />3 <br /> <br />'" <br />a- <br /> <br /> Mendays per Mandays by evaluation year for <br /> site per Work Item No. 1 <br /> Method of irrigation evaluation Year 1 Year 2 Year N* <br /> period No. of Man- No. of Man- No. of Man- <br /> sites days sites days sites days <br /> All methods 2.50 ,10 25.0C 3 7.50 3 7.50 <br />. Subtotal 25.00 7.50 7.50 <br /> Mandays pe Mandays by evaluation year for <br /> site per Work Items No. 2, 3, and 4 <br /> Method of irrigation year Year 1 Year 2 Year N* <br /> No. of Man- No. of Man- No. of Man- <br /> sites davs sites davs sites davs <br /> Border or semi-controlled flooding 10.00 5 50.0< 5 50.00 5 50.0C <br /> Sprinkler or trickle 18.57 4 74.2/ 4 74.28 4 74.28 <br /> Furrow 10.00 1 10.0< 1 10.00 1 10.0C <br /> Subtotal 134.2/ 134.28 134.28 <br /> Total man days 159.2/ 141.78 .141.7/ <br /> Gosl; per Manpower cost by evaluation year <br /> mandav <br /> Total Manpower Cost $100.00 $15928 $14178 $14178 <br />