Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Section lA - GENERAL DFSCRIPTION AND SCOPE OF TIlE WORK <br /> <br />lA.l. GENERAL. This section covers the general project description and scope of the constrUction <br />work under these specifications designated PETERSON RESERVOIR DAM PROJECT for The City of <br />Greeley. <br /> <br />The PROJECT is located approximately forty-five (45) miles west of Fort Collins, Colorado with <br />access via Colorado Highway 14 and County Road?? <br /> <br />lA.2. WORK INCLUDED UNDER THESE SPECIFICATIONS. The work under these specifica- <br />tions shall include furnishing all equipment and materials; providing all labor, supervision, .tlmini<tra- <br />tion and management; and supplying all constrUction equipment, materials, and services necessary to <br />perform the work complete in accordance with the specifications, drawings, and other contract <br />documents, except as specifically excluded under WORK FURNISHED BY THE OWNER. <br /> <br />ConstrUction surveying required to layout work including slope staking and location of <br />strUctures. Cross-section surveying as required to measure quantities of work to be paid for as <br />unit prices and for providing as-constrUcted drawings of the completed project. <br /> <br />Clearing ,stripping, and grubbing all excavation and fill in the dam and spillway area, outlet <br />channel, borrow areas, and saddle dam. <br /> <br />Removing and stockpiling riprap on the existing dam and saddle dam as shown on the <br />Drawings. <br /> <br />Excavation and removal of the existing dam including existing outlet works and service <br />spillway piping and appurtenant strUctures. <br /> <br />ConstrUction of new "Roller Compacted Concrete Dam" and spillway. <br /> <br />ConstrUction of outlet works including gate tower, outlet conduit, and outlet strUcture <br />including all gates and operators. <br /> <br />Excavation and fill as required to raise the existing saddle dam (existing emergency spillway) <br />embankment. <br /> <br />Furnish and place riprap in the spillway and outlet channels, on the upstream face of the saddle <br />dam, and around the dam as shown. <br /> <br />Aggregate surfacing and erosion control seeding of all disturbed areas above the normal <br />waterline. <br /> <br />The above explanations and listings are intended to give a general definition of the scope of the work <br />under these specifications and shall not be constrUed to be an itemized listing of each element of work <br />required. The Contractor shall be responsible for constrUction of complete facilities, conforming in all <br />respects to the details and requirements of the specifications, drawings, and other contract documents. <br /> <br />lA-l <br />92.{)24 <br />