Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DIVISION 1 - GENERAL REQUIREMENTS <br /> <br />TABLE OF CONTENTS <br /> <br />fw <br /> <br />Section lA - GENERAL DESCRIPTION AND <br />SCOPE OR THE WORK <br /> <br />lA-l thru lA-2 <br /> <br />lA.l General <br />lA.2 Work Included Under these Specifications <br />lA.3 Work Furnished by the Owner <br />lA.4 Contour Verification <br /> <br />lA-l <br /> <br />lA-l <br /> <br />1A-2 <br />1A-2 <br /> <br />Section lB - DRAWING LIST <br /> <br />lB-1 <br /> <br />Section lC - ENGINEERING DATA <br /> <br />1C-l thru lC-6 <br /> <br />lC.l General <br />lC.2 Submittal Requirements <br />lC.3 Resubmittal Requirements <br />lCA Shop Drawings <br />lC.S Samples <br />lC.6 Operation & Maintenance Manuals <br />lC.7 Review of Submittals <br />1 C. 8 Distribution <br /> <br />lC-1 <br />lC-l <br />1C-3 <br />1C-3 <br />1C-4 <br />lC-4 <br />lC-S <br />1C-6 <br /> <br />Section 10 - CONSTRUCTION SERVICES <br /> <br />lD-1 thru 10-2 <br /> <br />10.1 General <br />10.2 Construction Plant and Temporary Facilities <br />10.3 Construction Utilities <br />lOA Water <br />10.5 Sanitary Facilities <br />10.6 First Aid <br />10.7 Project Sign <br /> <br />ID-l <br />ID-I <br />ID-I <br />ID-I <br />ID-1 <br />lD-1 <br />ID-2 <br /> <br />Section IE - CONSTRUCTION SCHEDULE <br /> <br />lE-l <br /> <br />IE. I General <br />lE.2 Milestone Dates <br />lE.3 Contractor's Detailed Schedule <br />lEA Schedule Meeting <br /> <br />Section IF - STATE ENGINEER'S REQUIREMENTS <br /> <br />IE-l <br />lE-l <br />lE-1 <br />lE-1 <br /> <br />IF-1 <br /> <br />TC-l-l <br />92-m4 <br />