My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04027
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:21 PM
Creation date
10/12/2006 12:05:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449
Description
Platte River Studies
State
CO
Basin
South Platte
Date
3/1/1993
Author
TEC
Title
Project Manual for Peterson Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DIVISION 1 - GENERAL REQUIREMENTS <br /> <br />TABLE OF CONTENTS <br /> <br />fw <br /> <br />Section lA - GENERAL DESCRIPTION AND <br />SCOPE OR THE WORK <br /> <br />lA-l thru lA-2 <br /> <br />lA.l General <br />lA.2 Work Included Under these Specifications <br />lA.3 Work Furnished by the Owner <br />lA.4 Contour Verification <br /> <br />lA-l <br /> <br />lA-l <br /> <br />1A-2 <br />1A-2 <br /> <br />Section lB - DRAWING LIST <br /> <br />lB-1 <br /> <br />Section lC - ENGINEERING DATA <br /> <br />1C-l thru lC-6 <br /> <br />lC.l General <br />lC.2 Submittal Requirements <br />lC.3 Resubmittal Requirements <br />lCA Shop Drawings <br />lC.S Samples <br />lC.6 Operation & Maintenance Manuals <br />lC.7 Review of Submittals <br />1 C. 8 Distribution <br /> <br />lC-1 <br />lC-l <br />1C-3 <br />1C-3 <br />1C-4 <br />lC-4 <br />lC-S <br />1C-6 <br /> <br />Section 10 - CONSTRUCTION SERVICES <br /> <br />lD-1 thru 10-2 <br /> <br />10.1 General <br />10.2 Construction Plant and Temporary Facilities <br />10.3 Construction Utilities <br />lOA Water <br />10.5 Sanitary Facilities <br />10.6 First Aid <br />10.7 Project Sign <br /> <br />ID-l <br />ID-I <br />ID-I <br />ID-I <br />ID-1 <br />lD-1 <br />ID-2 <br /> <br />Section IE - CONSTRUCTION SCHEDULE <br /> <br />lE-l <br /> <br />IE. I General <br />lE.2 Milestone Dates <br />lE.3 Contractor's Detailed Schedule <br />lEA Schedule Meeting <br /> <br />Section IF - STATE ENGINEER'S REQUIREMENTS <br /> <br />IE-l <br />lE-l <br />lE-1 <br />lE-1 <br /> <br />IF-1 <br /> <br />TC-l-l <br />92-m4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.