Laserfiche WebLink
<br />F <br /> <br />G <br /> <br />H <br /> <br />I <br /> <br />] <br /> <br />K <br /> <br />L <br /> <br />M <br /> <br />N <br /> <br />o <br /> <br />p <br /> <br />Installation instructions, operating and maintenance manuals, and preventive maintenance <br />instructions and recommended frequency. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Schematic diagrams of power, control, and piping systems. <br /> <br />General bulletins and catalog cuts describing complete apparatus including operating <br />principles and fundamentals. <br /> <br />Service data sheets showing design performance, utility requirements, eIl:., <br />as applicable to the specific duty of the equipment. <br /> <br />Head capacity curves for pumps, with impeller size furnished, and maximum size <br />available indicated. <br /> <br />Curves and/or data for over-all range of operation from minimum to maximum capacity <br />or load, showing utilities motive medium required, total or incremental differential head, <br />and other pertinent information applicable to the equipment or component assemblies. <br /> <br />Materials of construction of all components. <br /> <br />Renewal parts list with diagrammatic or cross-section drawings showing part identifica- <br />tion. Include material analysis or trade designation for each significant part on parts <br />lists. <br /> <br />Stuffing box sizes; packing sizes; and mechanical seal details, arrangement, specifica- <br />tions, etc., if furnished in equipment. <br /> <br />Bearing manufacturer's standard identification and/or interchangeable number for all <br />anti-friction bearings in the equipment proper and its accessory items. <br /> <br />Material gradation, design mix, job mix formula, and/or material analysis. <br /> <br />F. <br /> <br />MINIMUM NUMBER REQUIRED <br /> <br />1. Shop Drawings <br />a. Number Contractor requires plus three (3) copies which will be retained by <br />Engineer, five (5) copies minimum. <br />b. In lieu of above, submit a reproducible transparency and 0 n e ( I ) <br />copy. Engineer will return the transparency with stamp and comments <br />noted thereon. <br />c. Submit four (4) additional copies for inclusion in Operation and <br />Maintenance manuals where Operation and Maintenance manuals are called <br />for. Where field modifications are made after acceptance, indicate "as <br />constructed" conditions, mark copies "AS CONSTRUCTED", and submit <br />prior to Substantial Completion. <br /> <br />IC-2 <br />92.()24 <br />