My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04003
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:53:12 PM
Creation date
10/12/2006 12:05:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
7/16/1983
Author
Region IX IFHMT
Title
Interagency Flood Hazard Mitigation Report in Response to the July 1 1983 Disaster Declarations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />l:C <br />c <br />C'" <br /> <br />;.:~~~~~J <br />.,.,-. of the same. The designated coordinator would assist local govern- <br />ments in preparing each element of the preparedness and response <br />plan. The state and local government's officials would activate <br />the plan. <br /> <br />Action Agency: <br /> <br />National Oceanic Atmospheric Administration (DOC) <br />National Weather Service (DOC) <br />Federal Emergency Management Agency <br />State, county, local and Tribal governments <br />Local radio stations <br /> <br />Financing: <br /> <br />Federal Emergency Management Agency <br />National Weather Service (DOC) <br />State of Arizona <br />State of California <br /> <br />Schedule: <br /> <br />One to two weeks <br /> <br />WORK ELEMENT #5 <br /> <br />The Bureau of Indian Affairs (DOl) will encourage the Tribes to <br />adoPt~floodplain management policies as part of a general plan for <br />the Indian lands located alonq the Colorado River. <br /> <br />Background: While some of the tribes located along the Colorado <br />River do have land use and zoning regulations, the majority have <br />not developed floodplain management policies. Floodplain manage- <br />ment achieves or strives for appropriate land use through a mixture <br />of traditional nonstructural measures (such as: land use adjust- <br />ments, flood warning systems, zoning, land acquisition, natural <br />parks, greenbelts or recreational areas) and structural measures <br />(such as: retention reservoirs, levees, or diversion structures). <br />Protection and enhancement of the natural floodplain resource will <br />help eliminate future disasters. <br /> <br />The Bureau of Indian Affairs will coordinate with the Tribes to <br />encourage adoption of floodplain management policies and plans. <br />Advice on appropriate types of floodplain management measures can <br />be provided as necessary from the following agencies: FEMA, the <br />Bureau of Reclamation (DOl), the U.S. Army Corps of Engineers (DA), <br />Soil Conservation Service (USDA). <br /> <br />Action Agency: <br /> <br />Bureau of Indian Affairs (DOl) <br /> <br />Financing: <br /> <br />None required <br /> <br />Schedule: <br /> <br />Bureau of Indian Affairs (DOl) will meet with <br />the Tribes within 30 days <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.