Laserfiche WebLink
<br />. <br /> <br />00274Q <br /> <br />. <br /> <br />B. Summarization of data concerning bank erosion control needs <br />as a basis for development studies <br /> <br />1. Concerning areas where existing control might be supplemented <br /> <br />2. Concerning areas currently without bank protection <br /> <br />NAVIGATION <br /> <br />I. Navigation Needs <br /> <br />A. Determination of commercial navigation needs (Makeup and volume <br />of commerce from Economics Work Group) <br /> <br />1. Appraisal of the existing project on the Missouri River, <br />Sioux City to the mouth <br /> <br />a. Preparation of summary of existing project to cover: <br /> <br />(1) Description <br /> <br /> <br />(a) Channel improvement <br /> <br /> <br />(b) Commercial navigation terminal facilities <br /> <br /> <br />(2) Navigation use <br /> <br />(a) Summary of past and current commercial traffic <br /> <br />b. Review of previous estimates of future use, on the <br />basis of future economic growth indicated by the <br />economic base study <br /> <br />c. Evaluation of adequacy of tl:e existing project with regard <br />to: <br /> <br />(1) Channel improvement <br /> <br />(2) Commercial navigation terminal facilities <br /> <br />2. Determination of potential additional commercial navigation <br />needs for consideration in connection with development of <br />a comprehensive framework plan. (It is anticipated that <br />such determination will be based on review of the results <br />of past studies, other data readily available, and review <br />of the economic base studies.) <br /> <br />a. Consideration of desirability of slackwater navigation <br />on the Missouri River, Yankton to tl:e mouth. <br /> <br />16 <br /> <br />