Laserfiche WebLink
<br />. <br /> <br />00274g <br /> <br />. <br /> <br /> <br />1. Concerning areas where existing flood protection might <br />be supplemented. <br /> <br />a. Name and description of existing flood control <br />projects and description of area affected. <br /> <br />b . Degree of protection provided <br /> <br />c. Flood problems <br /> <br />(1) Under current economic conditions <br /> <br />(2) Under conditions of future economic growth <br />as indicated by economic base studies <br /> <br />2. Concerning areas currently without flood protection where <br />flood protection appears warranted. <br /> <br />a. Location and description of flooded area <br /> <br />b. Flood problems <br /> <br />(1) Under current economic conditions <br /> <br />(2) Under conditions of future economic growth as <br />indicated by economic base studies <br /> <br />III Bank erosion control needs <br /> <br />A. Determination of bank erosion problem areas <br /> <br />1. Review of existing projects for bank erosion control <br /> <br />a. Preparation of summary of existing projects <br /> <br />b. Analyze adequacy of existing projects with regard to <br />performance of intended function <br /> <br />c. Formulation of conclusions concerning adequacy of <br />existing projects with regard to areas affected <br /> <br />d. Evaluation of needs concerning deSirable modification of <br />existing projects <br /> <br />2. Evaluation of bank erosion problems in areas currently <br />without bank protection <br /> <br />a. Summarization of available data on bank erosion <br />problems <br /> <br />(1) Under current economic conditions <br /> <br />(2) Under conditions of future economic growth as <br />indicated by economic base studies <br /> <br />15 <br />