Laserfiche WebLink
<br />. <br /> <br />00274"' <br /> <br />. <br /> <br />(2) Evaluation of adequacy of existing flood <br />control projects. <br /> <br />(a) Under current economic conditions <br /> <br />(b) Under conditions of future economic growth <br />as indicated by economic base studies. <br /> <br />2. Evaluation of flood problems in areas currently without any <br />flood protection <br /> <br />a. Summarization and review of available data on flood <br />damages <br /> <br />(1) Sources <br /> <br />(a) Federal, State, and local agency files <br />(2) Organization <br /> <br />(a) :By specific locality for urban damages <br /> <br />(b) By stream reaches and upstream watersheds for <br />rural damages. <br /> <br />b. Comparison of stream channel capacities with stream <br />discharge frequency data which will be prepared by <br />the Work Group on HYdrologic Projections <br /> <br />c. Preliminary designation of flood problem areas on the <br />basis of studies described in items a and b, above. <br /> <br />(1) By specific localities where urban damages are <br />involved. <br /> <br />(2) By stream reaches and upstream watersheds where <br />rural damages are involved. <br /> <br />d. Appraisal of flood damages in the areas designated as <br />flood problem areas. <br /> <br />(1) Under current economic conditions <br /> <br />(2) Under conditions of future economic growth as indi- <br />cated by economic base studies. <br /> <br />C. Summarization of data concerning flood control needs as a basis <br />for development studies <br /> <br />14 <br /> <br />