Laserfiche WebLink
<br />. <br /> <br />0027511 <br /> <br />. <br /> <br />b. Consideration of desirability of studies of potential <br />commercial navigation projects. <br /> <br />3. Evaluation of the need for additional commercial navigation <br />projects. <br /> <br />4. Summarization of data concerning commercial navigation needs <br />as a basis for development studies. <br /> <br />a. Concerning modification of the existing project on the <br />Missouri River, Sioux City to the mouth <br /> <br />ELECTRIC POWER <br /> <br />I. Electric Power Loads and Supply - 1960 <br />A. Loads (by market areas and appropriate subareas) <br /> <br />1. Peak - kw <br /> <br />2 , Energy - kwh <br /> <br />B. Supply (by market areas and appropriate subareas) <br /> <br />1. Hydro- kw <br /> <br />2. Steam - kw <br /> <br />3. Other - kw <br />4. Total - kw <br /> <br />C. Interchange of energy <br /> <br />1. Exports - kwh <br /> <br />2 . Imports - kwh <br /> <br />3. Net exports - kwh <br /> <br />II. Estimated electric power requirements and necessary capacity supply, <br />1970, 1980, 1990, 2000, 2010, and '2020. <br /> <br />A. Loads (by market areas and appropriate subareas) <br /> <br />1. Peak - kw <br /> <br />2 . Energy - kwh <br /> <br />B. Capaci ty requirements (by market areas and appropriate subareas) <br /> <br />17 <br /> <br />