My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03646
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:25 PM
Creation date
10/11/2006 11:53:47 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.200
Description
Paradox Valley Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
2/1/1984
Title
Status Report Highlighting Deep Well Injection/ Brine Collection/ Water Rights/ and Projected Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />7 <br /> <br />It will still be necessary to file for permanent water rights as the project is <br /> <br />put into operation. Preliminary reaction from the State is being sought in <br /> <br />order to confirm the availability of permanent water rights. The Bureau of <br /> <br />Reclamation recognizes state water law and will make all attempts to plan and <br /> <br />operate this project within these laws. However, the state must continue to <br /> <br />provide interim opinions on this issue for Reclamation to continue recommending <br /> <br />construction. <br /> <br />Schedule <br /> <br />The following schedule shows general activities required to proceed from the <br /> <br />project's present stage to project operation. The list of activities allows <br /> <br />for 2 options, deep well brine disposal and Radium Evaporation Pond brine <br /> <br />disposal. If the initial injection well test shows injection disposal to be <br /> <br />not feasible, evaporation ponds will again be persued. The attached bar charts <br /> <br />show the schedule to project completion. The Radium Evaporation pond option <br /> <br />was not plotted on a bar chart. <br /> <br />Activity Schedule <br /> <br />Activity <br /> <br />Duration <br /> <br />Schedule <br /> <br />1. Geophysical data purchase <br />(Target on Union) <br /> <br />Complete <br /> <br />2. Two independent geophysists <br />study of geophysical data <br />and recommendation on <br />injection well sites. <br /> <br />2 months <br /> <br />May, June 1984 <br />(May contract award) <br /> <br />3. Select injection well location <br />for drilling and testing. <br />In-house Bureau decision. <br /> <br />1 month <br /> <br />July 1984 <br /> <br />QOG'[)c\3 <br /> <br />';:._:.::;~l;::;:_~,:'f~-':>'~"::~~~-;':~~'{:".~~.,t-r,:_';,:~}t~j~2.l,'f:;,/l-~>::,~,~,_:,'.~I.!'~~~i'f.~~~t.l\:~Nj;,:",:\'.qJ/.""J)':i2i~i;'~!l_::?;;-rr'".~~:~",.r::;;'~"p"l'-!." '_'< ~;~'"\'!:ii!t,2.!~;:~.;'::l"~:"'?~-"'l:_o::'P~!~~\;? -'_~;~':':"::'."':'0::':-r,:'r:.~'\~7~:;":'~ ::"'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.