My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03646
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:51:25 PM
Creation date
10/11/2006 11:53:47 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.200
Description
Paradox Valley Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
2/1/1984
Title
Status Report Highlighting Deep Well Injection/ Brine Collection/ Water Rights/ and Projected Schedule
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />4. Injection well system design. <br />This will include construction <br />level design on the well and <br />completion and testing plan. <br />P~d31~iliL) &~ad~ b~Er4Le <br />f~~il!tJ d~~lgH sRi fellww <br />t8r':'_bL. t,;uu:;;LLu\..L.lvu G~g13t4l\ce <br />will dolo..., b~ Im..L.~d....d. If <br />additional geophysical data <br />is found necessary, its purchase <br />and interpretation will also be <br />included in this contract. <br /> <br />5. Prepare and award injection <br />well construction contract <br /> <br />. <br /> <br />8 <br /> <br />6 months <br /> <br />Aug. 84 - Jan. 85 <br /> <br />2 months specs <br />6 months contract <br />'8 ~onths <br /> <br />Feb.- Sept. 85 <br /> <br />Oct. 85 - June 86 <br /> <br />6. Construct and Test Injection Well 9 months <br /> <br />July - Sept. 86 <br /> <br />7. Evaluate injection well test 3 months <br />results and decide on final <br />disposal method (injection <br />wells or evaporation) <br /> <br />Note: Steps to complete the project will depend on the final disposal <br />method selected, deep well injection or the original plan of <br />Radium Evaporation Pond. <br /> <br />Deep Well Injection Disposal <br /> <br />Activity <br /> <br />Duration <br /> <br />8A. Prepare Supplements to <br />DPR-Appendicies - EIS, fulfill <br />NEPA requirements, and obtain <br />Washington approval. <br /> <br />9A. Collect Construction Design <br />Data and prepare designs, <br />specs, and contracts. <br /> <br />lOA. Award Construction Contracts <br />and Build Permanent Facilities <br /> <br />llA. Facility Start up and <br />Trouble Shoot <br /> <br />l2A. Permanent Operation <br /> <br />Schedule <br /> <br />1 year <br /> <br />Oct. 86 - Sept. 87 <br /> <br />2 years <br />(concurrent with <br />report process) <br /> <br />Oct. 86 - Sept. 88 <br /> <br />2 years <br /> <br />Oct. 88 - Sept. 90 <br /> <br />9 months <br /> <br />Oct. 90 - June 91 <br /> <br />continuous <br /> <br />GOO'J4ft <br /> <br />. '.'-;::~-:-,~::;:;7;:a'~'z;.-~~"?Z~~);:~t~':\~P~~~;;:?_t:.-;U};\:;: ~_'.i~~~~':?"tl\'.~~1'1:f0. \:'>\";(1~-:-."G\Z~'l.t_!;;I,,:1:!.{0j~;:F~.~::;:'<..:~.f;t;.~'-;;;;=9,"A,ii:.~Y$_'\':~'~~'.>" c':-.~S:rfi:-f_ ~_'~';:'~.'_\l>"';'\$-::7~.:-.':'~Y,':T~G'J~~~ !:~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.