My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03477
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:36 PM
Creation date
10/11/2006 11:45:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1990
Author
Central Utah WCD
Title
Construction Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />23 <br /> <br />USBR <br /> <br />s.econd. The re:>tn'oir remaim nearl\" full. Turbidity monitoring of the <br />reservoir and streams has been reduced to a monthl\' basi:;.. <br /> <br />Repair of Cracks in Upper Stillwater Dam <br />MoJification ~o. 8 extended the Cllnlract and din~CteJ extra work. <br />This work included probing and tlushing oS; drain holes, packer testing <br />22 h(lle:-, and cleaning sand from the galle-f)' gutters. The comraCtl,Jf h,lS <br />completed flushing and testing al] drain holes in the lower gallery, and <br />i'i> continuing work in the upper gallt'TY. <br /> <br />BONNEVILLE UNIT <br /> <br />Jonlanelle Dam. Stage 2 <br />Crews cOIHinued exca\'ation and cleanup on the fllUnJation and <br />right abutment. Blasting, excavation, removal of muck, and imtallation <br />of rockbohs and chain link fabric Cl.mtinued on the low It'vel outlet <br />works structure slope. Steel supports were installed on 3-foot cemer:<o, <br />and blaHing was started on the low level outlet works tunnel inlet <br />structure. Crews completed drilling of foundadclO pie::omerer wells, and <br />cominued Jrilling of foundation dewatering wl"ik Installation of chain <br />link fahric on the left abutment block slide was completed. <br />A ribhon-cuning ceremony, opening U.S. Ih~h\\'ay 4-0 [0 traffic, \,,'as <br />held September 30. 1989. <br />Reclamation represematives held a meeting with the \Vasatch <br />C0unq; Commis:<oion on September 25, 19SQ, to hrief the commission <br />on Olson/Neihart tailing :<otudie:<o, Jordanelle reaeation studies, and <br />watef quality issues at )0rJanelh.' Re:<oen"oir. <br /> <br />O('[ober, 1989 <br /> <br />Alpine AqUt..duct, Reach 2 <br />Installation and back filing: of 3r.-inch pretensioned concrete cylinder <br />pipe continues. The pipe is untested [0 approximate :<otation 9+00. <br />Construction of val\"{' and blowoff structures continue:<o. Pipe laying <br />will be suspended at pipeline :<otation 5+80, pending redesign of the <br />aqueduct realignment and design consideratillOs between stations 0+0('1 <br />and 5+80. <br /> <br />StrawbeTT~' Aqueduct anJ Collection System <br />General <br />Transfer inspections of U prer S6Ih,,'ater Dam were conducted <br />September 21 and 22, 198\), and of Soldier Creek Dam on September <br />
The URL can be used to link to this page
Your browser does not support the video tag.