My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03477
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:36 PM
Creation date
10/11/2006 11:45:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1990
Author
Central Utah WCD
Title
Construction Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Reclamation to collect de$ign data and write specifications for movin~ <br />and stabili:ing the Olson/:\'eihart tailings. <br /> <br />Jordanelle Dam, Stage 1 <br /> <br />The Provo River diversion channel, the assLxiated U.S. Highway No. <br />40 dt:tour, and the equipment crossing were completed. The contractor <br />continued foundation excavation. encountering bedrock between <br />stations 18+;0 and 22+100. Dewatering and pie:ometer wells are bdng <br />drilled, and pumps are being installed in the dewatering wells. Crews <br />drilled and shO[ slopes f('lr the low level outlet works structure and the <br />intake structure, and installed rock bolts and chain link fabric. The <br />inlet channel and $Iope$ for the selective level outler works intake <br />structure were excavated. The \Vasatch County Fire Department <br />butnl'J six houses in the reservoir flood area. <br /> <br />Pro\'O River Fishery Flows <br />The Memorandum of Understanding (MOU) re~arding Provo River <br />fishery tlows was $igned by water users on August 17 and 18. 1989. The <br />categorical exclusion is nearing completion. Subsequently, the ~10U <br />will he finali:ed. <br /> <br />Upper Provo Rh'er Resen'oirs <br />Utah Projects Office representatives attended a meeting: August 16, <br />1989, with the Central Utah \Vater Conservancy District (CU\VCD) <br />and the Provo River \Vater Users Association, to discuss plans to <br />rehabilitate Trial Lake Dam consistent with Project needs, and to <br />review associated draft contracts. <br /> <br />Diamond Fork System <br /> <br />Syar Tunnel <br />Excavation with the tunnel boring machine has progressed 3.859 <br />linear feet, to station 334+91. Hauling of crushed gravel surfacing for <br />the Syar Tunnel Acces~ Road was completed. and surfacing was mixed <br />with a dust inhibitor and placed. Precasting of invert segment... <br />continued, for a total of 6,893 segments to date. <br /> <br />Strawberry Aqueduct and Collection System <br />Upper Stillwater Dam <br />General <br />Diversions from Upper Stillwater Resen'oir through Strawberry <br />Aqueduct continue. Minimum fish tlows below the confluence of <br />South Fork and Rock Creek are bt-ing: maintained at ~9 cubic feet per <br /> <br />22 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.