My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03477
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:36 PM
Creation date
10/11/2006 11:45:21 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1990
Author
Central Utah WCD
Title
Construction Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />26,1989. The.;... iacilitit's 3rt' scheduled for transfer to the Cenlral Utah <br />\\';:lTer Consen'anl-y District in the near tUlure. <br />The Streamflow Agreement Committee met on SertelnN-r ~6, 1989. <br />and subsequently approved interim fishery releases on Strawberry <br />Colle~~ti~m s\'stem streams to provide -H,400 acre-feet annually. <br /> <br />!\.lunicipal and Industrial System Non'mber, 1989 <br />Jordanelle Dam, St3J.:C 2 <br />The porrion of U.S. Highway 40 extending through the damsitf' was <br />closed on October ~. 1989. Traffic has bet'n moved to the relocated <br />highway and the \Vasatch County Road. Foundation excavation and <br />cleanup continued. Drilling and blasting continued on tht' right <br />abutment and knob, the low It'wl outlet works, and the selective It'wl <br />outlet works. Shot crete and drain holt'!> were added tll stabili:e one area <br />of jointt"d rock nn the low level outlet structure slopes. By October 27. <br />1989. the low level outlet works inlet tunnel had bet'n excavated to <br />station 5+23 and steel sets had been installed. Installation of chain link <br />fabric and rockbolts continued. A water treatment tank was installed <br />and an extension to the existing turbidity control "tructure was <br />constructed. <br /> <br />Strawherry Aqueduct and ColIE'l'Iion System <br />Gl'neral <br />A meeting was held October 27, 1989, with Ihe CU\VCD to St't <br />transfer dates for project features now being operated by the CU\\'CD <br />under term~ of the Oreration and Maintenance C(loperatiw <br />Ag:re~ment. Th~ foll{lwing dales \\"~re set: January I, 1990 for tran!'fer <br />of Va! and Hades Diversion Dams; and Arril I. 1990, for [ransf~r of <br />Rhode!> and \Vin Diyen,ion ~truclUre!'. Soldier Creek and Urper <br />Stillwater Dam" will be transferred at a later date. pending approval by <br />the Denver and Rt'"gional Office!'. July I, 1989, was. confirmed as the <br />official tramfer date for Docs. Diwr"ion Dam and Feeder Pipeline. <br /> <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.