Laserfiche WebLink
<br />DOLORES CAN YON <br />EVAPORATION <br />ALTERNATIVE <br />#4 <br /> <br /> <br />Evaporation ;!; <br />Ponds }~: <br /> <br />...~.~.: <br /> <br />. <br /> <br />'ll <br />- <br />'<: <br />'" <br />'ll <br /> <br /> <br />5. Gateway Evaporation <br /> <br />This alternative is similar to the Dolores Canyon plan except that saline <br />water would be transported by pipeline to a more satisfactory flat area, <br />near Gateway, for evaporation. No highway relocation and considerably <br />less heavy riprapping would be required. Again, no pumping would be <br />necessary. <br /> <br />Construction would take about 2 years. <br /> <br /> <br />Evaporation <br />Ponds I <br />[ <br />1 <br />I <br />I <br />'e:;, <br />Pipeline 1~ <br />(;) <br /> <br /> <br />GATEWAY <br />EVAPORATION <br />ALTERNATIVE <br />#5 <br /> <br />'"'f <br />i <br /> <br />6 <br />