My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03462
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03462
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:45:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.550
Description
Sinbad Valley Unit - Colorado River Salinity Control Program
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
4/1/1983
Title
Sinbad Valley Salinity Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. Si nbad Deep Well. <br /> <br />This alternative would include a cut off wall just downstream of where the <br />springs emerge, a pumping plant, and a pipeline from the pumping plant to <br />an abandoned wil dcat oil well named "No.1 Si nbad Unit". The oil well <br />located in the extreme southwest corner of Section 16, would be <br />rehabil itated for injection. The formation selected for injection would <br />probably be a Mississippi age limestone located approximately 12,000 feet <br />deep. The existing well is reportedly plugged and abandoned at its final <br />depth of about 13,700 feet. From information developed by Williams <br />Brothers Engineering for the proposed deep well injection program in <br />Paradox Valley, up to 100 gallons per minute could be injected into the <br />limestone formation, without pressure. For the alternative evaluation it <br />was assumed that the .1 and .2 cfs alternative would not require pressure. <br />For these alternatives capital costs were included for injection pumps, <br />but no annual power requirement was included for injection. It was <br />assumed that the .3 cfs alternative would require pumping at 250 psi of <br />pressure. <br /> <br />Construction would take about 1 year. <br /> <br />SINBAO <br />VALLEY <br /> <br />SINBAD <br />DEEP WELL <br />ALTERNATIVE <br />#2 <br /> <br />C;) <br /><:l <br />,.. <br /><:l <br />'lI <br />'" <br />'" <br /> <br /> <br />~ <br />- <br /> <br />'<: <br />'" <br />~ <br /> <br /> <br />n021Q5 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.