My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03460
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:44:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1989
Title
Annual Operating Plans - Colorado Big Thompson Project - Water Year 1989-1990
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />~ <br />-.J <br />c..." <br /><;.Jt <br /> <br />recorded 12.5 inches on Ap...il 1, Willow Creek 8.2 inches on Ma...ch 1, <br />Granby 9.7 inches on March 1, and Lake Estes 8.4 inches on I~arch 1. <br />Pe...cent of normal ...anged from 84 pe...cent at the Green Mountain watershed <br />to 99 pe...cent at the Will ow C...eek watershed. <br /> <br />I <br />I <br />.' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Snow courses for wate...sheds within the P...oject averaged only 52 percent <br />of no...ma1 snowpack wate... content on May 1. All wate...sheds, except fo... <br />Green Mountain, received much below normal precipitation in April. The <br />Willow C...eek and Lake Granby watersheds reco...ded snow-wate... accumulations <br />on May 1 of only 32 percent of normal and 50 percent of normal, <br />respect i ve 1y. The May 1 snow-water content fo... the Green Mounta i n <br />watershed was 71 percent of normal. The Lake Estes watershed snow-water <br />content was 51 pe...cent of average on May 1. <br /> <br />Steady rainfall occurred in the Lake Estes a...ea during May 13 through <br />May 17 with 1.20 inches ...ecorded ove... the five days. Howeve.... <br />precipitation continued to be below no...ma1 ove... the Project and averaged <br />only 63 percent of ave...age. Precipitation was below no...ma1 over the <br />Project a...ea in June, with Willow Creek and Lake G...anby at 73 percent of <br />average, Green Mountain at 72 percent of ave...age, and Lake Estes at 86 <br />percent of average. July through September p...ecipitation was varied on <br />all wate...sheds. The Green Mountain watershed ...ecorded 111 percent of <br />ave...age p...ecipitation in July and only 42 pe...cent of average in <br />September. A total of only 3.89 inches of p...ecipitation was ...ecorded on <br />the Willow Creek and Lake G...anby wate...sheds f...om July through Septembe... <br />and this was 72 percent of average. Precipitation in the Lake Estes <br />area was near average fo... the three months, at 98 percent of average. <br /> <br />Tempe...atures were much above no...ma1 for the first three weeks of April. <br />Record tempe...atures were set in Denve... f...om April 21 through Ap...il 23 <br />with 89", 88", and 85" ...espective1y, being ...ecorded. Temperatures were <br />above normal fo... May with record tempe...atu...es being set in Denver at <br />87" on May 7 (tied 115 year reco...a) and on May 23 at 93" (new ...ecord). <br />June temperatu...es were nea... ave...age but a record heat wave hit the <br />first week in July with Denver setting a reco...d of five consecutive <br />days of ove... 100". <br /> <br />for wate... year 1989, the mlnlmum reco...ded tempe...atu...es were -46"F at <br />Green Mountain Rese...voir on February 7, -41"F at Lake G...anby on February <br />7, and -35"F at Lake Estes on Februa...y 3. Overall, winter temperatures <br />we...e near normal for the water yea..., except for a very cold February. <br /> <br />Varied summe... tempe...atures we...e recorded over the enti...e Project, with <br />temperatu...es peaking in early July. The maximum tempe...atures was 89"F <br />on July 5 and 6 at Green Mountain Rese...voi.... The maximum temperature at <br />Lake G...anby occu...red on July 6 and was 85"F. and Lake Estes reco...ded a <br />maximum temperatu...e of 96"F on July 8. <br /> <br />Alva B. Adams Tunnel (Adams Tunnel) diversions totaled 276,700 ac...e-feet <br />(118 percent of ave...age) for the water year. <br /> <br />Seasonal wate... de1ive...ies (Novembe... 1988-Septembe... 1989) we...e 137 percent <br />of ave...age for the,Project. <br /> <br />Project generation for the wate... yea... was above average at 104 percent of <br />ave...age. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.