Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />~ <br />--.J <br />CJl <br />.-::. <br /> <br />HIGHLIGHTS OF 1989 OPERATIONS <br /> <br />Wate... year 1989 runoff was be 1 ow average throu9hout the Co 1 orado-Bi 9 <br />Thompson Project (Project) va...yin9 f...om 55 percent of average for the <br />inflow into Willow C...eek Rese...voir to 81 percent of ave...age into Green <br />Mountain Reservoi.... <br /> <br />Peak inflows to reservoi...s within the P...oject occu...red in late May and <br />mid-June and were much below no...mal. On May 12, inflow to Willow Creek <br />Rese...voir peaked at 290 ft3/s. The inflow to G...een Mountain peaked on <br />May 24 at 1,910 ft3/s. Inflow to Lake G...anby peaked at 1,485 ft3/s on <br />May 30 and the Lake Estes inflow peaked on June 17 at 440 ft3/s. <br /> <br />River ...e1eases f...om Willow Creek Reservoi... and Lake Granby were made to <br />meet only minimum required ...e1eases fo... fish habitat. The maximum <br />release at Lake Estes for the water year was 305 ft3/s on August 3 to <br />bypass inflow. Project delive...ies peaked on August 17 at 769 ft3/s at <br />Ho...setooth Reservoir, and 581 ft3/s at Ca...te... Lake on July 9. The maximum <br />release at Green Mountain Rese...voir was 953 ft3/s on September 5 and the <br />maximum release of 500 ft3/s to the Big Thompson River occu......ed on <br />July 20. <br /> <br />Wate... year p...ecipitation totals for October-September va...ied f...om <br />80 percent of average on the Willow C...eek and Lake G...anby wate",sheds to <br />87 pe...cent of ave...age on the Lake Estes and St. Vrain wate...sheds. <br /> <br />Winte... p...ecipitation (Octobe"'-January) was below average on the Project, <br />at 73 percent of ave...age. The Lake Granby and Wi 110w C...eek watersheds <br />recei ved the fi ...st sign ifi cant ...ai n mi xed with snowfall of the water <br />yea... on Novembe... 3, 4, and 5 with 0.44 inches of prec i pitat i on bei ng <br />...ecorded. On Novembe... 3, the Green Mountain Dam station recorded <br />0.29 inches of precipitation due to ...ain mixed with snowfall. Snow and <br />rain occurred at Estes Park on Novembe... 15 and 0.40 inches of precipitation <br />was recorded. No significant dai ly snowfall above 0.50 inches was <br />...eco...ded on the P...oject in Decembe... and Janua...y. The Lake Estes <br />wate",shed was the on 1y a...ea to ...eco...d above normal preci p i tat ion fo... <br />January at 120 pe...cent of ave...age. Februa...y was a snowy month on the <br />Lake G...anby and Will ow C...eek wate",sheds with 164 percent of average <br />...eco...ded. The Green Mountain wate...shed was also above average for <br />F eb...uary averagi ng 160 percent of norma 1 preci pitat i on. A tot a 1 of <br />2.54 inches of p...ecipitation was ...ecorded fo... the Lake Estes watershed in <br />Feb...ua...y which was much above no...ma1 at 488 pe...cent of ave...age. <br /> <br />A major snowstorm hit the Project area f...om Feb...ua...y 2 through February <br />5, with 1.48 inches of precipitation recorded at G...een Mountain, 0.79 <br />inches of p...ecipitation reco...ded at Lake Granby, and 2.08 inches of <br />precipitation ...ecorded at Lake Estes. <br /> <br />Ma...ch snowfall was below normal on all watersheds within the P...oject with <br />Lake Estes precipitation at only 15 percent of average. Precipitation <br />due to snowfall was much below no...ma1 on all watersheds on the P...oject <br />in April, except for G...een Mountain at 123 percent of average. <br /> <br />The maximum snow-water accumulations fo... all watersheds on the P...oject <br />occu...red on March 1 and Ap...i 1 1. On the P...oject, Green Mountain <br /> <br />1 <br />