My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03460
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:50:31 PM
Creation date
10/11/2006 11:44:53 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1989
Title
Annual Operating Plans - Colorado Big Thompson Project - Water Year 1989-1990
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />~ <br />-1 <br />-.l <br />.:.."- <br /> <br />Reasonable Maximum Inflow Fo...ecast <br /> <br />I <br />. <br />. <br />.' <br />. <br />I <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Colo...ado-Big Thompson Project <br /> <br />Green Mountain Reservoi... <br /> <br />With a ...easonable maximum inflow forecast. releases from G...een Mountain <br />Rese...voir for bypass of inflow, replacement, power. and ...ive... and <br />...eservoi... ...egulation will ave...age 170 ft3/s in Februa...y and Ma...ch and <br />will be increased in April to nea... 475 ft3/s afte... ice conditions permit <br />to ...educe the storage content to 55,000 ac...e-feet by Ap...il 30. Releases <br />fo... power will be increased, as required, from May through July to allow <br />the reservoi... to fill without spilling in ea...ly July. June and July <br />releases a...e expected to average nea... 1,425 ft3/s. The reservoi... wi 11 <br />remain nearly full throughout the remainde... of the water yea.... With <br />reasonable maximum runoff, it is estimated that the cities of Colorado <br />Sp...ings and Denver would not deplete the Blue River du...ing <br />April-September. which would not cause any power inte...fe...ence at Green <br />Mountain Powerplant. <br /> <br />Willow Creek Rese...voir <br /> <br />Willow Creek Rese...voir storage would reach the maximum reservoi... capacity <br />of 10.200 acre-feet by the end of June. With above-ave...age storage <br />in G...anby and a reasonable maximum fo...ecast, 67,500 acre-feet of wate... <br />would be pumped to Granby during the April-July ...unoff period. <br />App...oximately 6.700 acre-feet of water fo... required irrigation <br />...equirements and fishery augmentation flows would be bypassed to the <br />...iver during Ap...il-July. Reservoi... sto...age would be near g.OOO ac...e-feet <br />at the end of the wate... year. <br /> <br />Lake G...anby <br /> <br />Sto...age in Lake G...anby will d...op to a minimum of about 134.100 acre-feet <br />by the end of March. Thereafter. Lake Granby sto...age wi 11 fi 11 to <br />417,900 acre-feet by the end of July which is 121.900 acre-feet below <br />the maximum reservoir capacity of 539.800 ac...e-feet. Reservoi... sto...age <br />of 409,700 acre-feet at the end of the wate... yea... would be near the <br />30-year ave...age of 419.500 acre-feet. <br /> <br />East Slope/Colorado-Big Thompson P...oject <br /> <br />With reasonable maximum runoff forecast on February 1. below-ave...age <br />supplemental i......igation demands equal to 162,800 acre-feet will be <br />expected on the P...oject du...i ng water year 1990. Di ve...s ions through <br />Adams Tunnel wi 11 be at capacity of 550 ft3/s from Februa...y 1 th...ough <br />March 20. Adams Tunnel and Olympus Tunnel diversions will be minimized <br />from Ma...ch 21 th...ough Ap...il 28 to accommodate the Pole Hill Canal, <br />Afterbay. and Powe...plant maintenance scheduled during this period. For <br />May th...ough Septembe.... Adams Tunnel diversions wi 11 be scheduled to <br />maximize the dive...sion of available "skim" water and meet irr-igation <br />demands on the east slope. Approximately 7.500 ac...e-feet of available <br />skim wate... would be bypassed du...ing June because Olympus Tunnel is at <br />capacity of 550 ft3/s. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.