Laserfiche WebLink
<br />I <br />I <br />I <br />,. <br />. <br />I <br />. <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />o <br />~ <br />-...l <br />-...l <br />~ <br /> <br />In April, 10,900 acre-feet will be r-eleased from Carter Lake to Flatir-on <br />Reservoir dur-ing the Pole Hill maintenance. This release is requir-ed <br />to meet the irrigation demands on the Big Thompson River and the minimum <br />inflow to Horsetooth Reservoir. The inflow to Carter- Lake and <br />Horsetooth Reser-voir- wi 11 be regulated from June thr-ough September to <br />maintain reservoir- storage at desirable levels and meet above nor-mal <br />ir-rigation demands. Irr-igation demands will draft Horsetooth Reservoir <br />stor-age to 56,000 acre-feet by September 30, which is 15,800 acr-e-feet <br />below average. The end of water year stor-age in Carter Lake of <br />15,200 acr-e-feet would be 30 per-cent of nor-mal. <br /> <br />21 <br />