Laserfiche WebLink
<br /> <br />plan. These include provisions for an archeological examination <br />prior to initiation of project construction; minimizing air <br />pollution in slash disposal operations with adequate dust abate. <br />ment during construction; reservoir clearing to be carried out in <br />such a way as to minimize the "clear-cutting" effect at the con- <br />servation pool level; making the clearing irregular and gradual <br />and possibly including artificial openings above the conservation <br />pool level; revegetation of disturbed areas; obliteration and <br />revegetation of temporary access roads; locating borrow areas <br />below the water level; removal of all stumps; and 100 percent slash <br />disposal. <br /> <br />Beca~se the Rito de la Olla presently supports a natural population <br />of Rio Grande cutthroat trout, measures will be taken to protect <br />this rare native species from problems attributable to the project <br />reservoir. Both the New Mexico Department of Game and Fish and the <br />9 <br />