Laserfiche WebLink
<br />,~ <br /> <br />.< <br />. <br /> <br />4) To assure the on-going implementation of the process <br />recommended herein, it is recommended that the Work Group <br />remain as presently constituted with representatives from <br />each of the Basin states, the Upper Colorado River <br />Commission, Western Area power Administration, the <br />International Boundary and Water Commission, and Bureau of <br />Reclamation. The ~hai~manship of the Work Group shall be <br />shared by the Bureau of Reclamation between the Chiefs of <br />Land and Water Operations, upper and Lower Colorado Regions. <br /> <br />Table 10 provides a summary timetable of key decision <br />points and actions relative to the development and changes to <br />AOP's during full reservoir conditions. <br /> <br />-42- <br />