My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03307
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:40 PM
Creation date
10/11/2006 11:39:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.600.10
Description
Big Sandy River Unit - Colorado River Salinity Control Program
State
WY
Basin
Colorado Mainstem
Date
1/1/1981
Title
Big Sandy River Unit Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER IV <br /> <br />DESIGNS AND ESTIMATES <br /> <br />,,~'''-~~:)'' <br />'"j!,;} <br /> <br />Role of. the Water and Power Resources Service <br /> <br />~ <br /> <br />Water and Power will continue as the lead agency for Phase II of the <br />study. It will be the responsibility of the lead agency to determine if, and <br />to what extent, a professional services contractor should be utilized for this <br />phase. If a contractor is not utilized, the agency will assume all of the <br />responsibilities outlined for the contractor previously. <br /> <br />Assuming that a contractor is selected, Water and Power will provide him <br />a list of features, design and environmental data collection criteria, and <br />design standards. The agency will review and approve the plan of study sub- <br />mitted by the contractor and provide critical review of all reports, designs, <br />and estimates submitted by the contractor. <br /> <br />Role of the Public <br /> <br />After the plan selection activities described in the preceding chapter <br />are completed, the role of the public will become someWhat less active until <br />the feasibility report and environmental report are ready for public review. <br />The public will be kept informed on the progress of the study by newsletters <br />to be sent out by the planning team leader during this phase as discussed in <br />Chapter II. Any comment or opinion will be considered by Water and Power and <br />the planning team. <br /> <br />0,11'1' ,~ <br />~~ "- v \"I <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.