My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03307
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:40 PM
Creation date
10/11/2006 11:39:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.600.10
Description
Big Sandy River Unit - Colorado River Salinity Control Program
State
WY
Basin
Colorado Mainstem
Date
1/1/1981
Title
Big Sandy River Unit Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER II <br /> <br />GENERAL APPROACH TO THE WORK <br /> <br />.- <br />e~ <br /> <br />4. Review contractor developed alternative plans for use of <br />saline water. <br /> <br />5. Make recommendations to planning team concerning plan selec- <br />tion. <br /> <br />6. Review the following points: <br /> <br />a. Present land use. <br /> <br />b. Irrigation methods and efficiencies. <br /> <br />c. Salinity impacts from existing practices. <br /> <br />d. On-farm inflow-outflow measurements to determine irriga- <br />tion efficiency and deep percolation. <br /> <br />e. Water rights. <br /> <br />7. Review contractor's investigation of water rights for selected <br />alternatives. <br /> <br />Economics and social impacts subteam <br /> <br />l. Review the following points: <br /> <br />a. Evaluation of social and econom1C conditions. <br /> <br />b. Evaluation of farm economics. <br /> <br />2. Review population projections. <br /> <br />3. Review future municipal and domestic water needs. <br /> <br />4. Help develop alternative plans. <br /> <br />5. Review contractor-developed alternative plans for economic and <br />social impacts of the project area. <br /> <br />6. Make recommendations to planning team concerning plan selection. <br /> <br />7. Evaluate selected plan for regional development and social <br />well-being. <br /> <br />8. Identify national economic development plan. <br /> <br />Environmental quality subteam <br /> <br />l. Work with cultural, historical, archaeological, biological, and <br />recreational aspects of the project. <br /> <br />G~llE8 <br /> <br />l4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.