My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03307
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:40 PM
Creation date
10/11/2006 11:39:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.600.10
Description
Big Sandy River Unit - Colorado River Salinity Control Program
State
WY
Basin
Colorado Mainstem
Date
1/1/1981
Title
Big Sandy River Unit Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER II <br /> <br />GENERAL APPROACH TO THE WORK <br /> <br />~~~ <br />~ <br /> <br />4. Responsible for activities of subteam. <br /> <br />5. Develop and/or select alternative plans for which contractor <br />would prepare designs, estimates, and environmental analysis. <br /> <br />6. Evaluate contractor prepared plans and selected plan(s) for <br />national economic development and environmental quality objec- <br />tives. <br /> <br />7. Apply four tests (effectiveness, completeness, efficiency and <br />acceptability) in evaluating alternative plans. <br /> <br />8. Select recommended plan through application of the Principles <br />and Standards. The four account system of analysis is used to <br />compare effects of candidate plans. <br /> <br />9. Subteam leaders are responsible for developing appropriate material <br />for feasibility report appendices. <br /> <br />Hydrosalinity identification and quantification subteam <br /> <br />l. Review prestudy well drilling, pumping and testing program. <br /> <br />2. <br /> <br />Review contractor's draft problem identification and quantifica- <br />tion report and provide comments for final report. <br /> <br />, <br /> <br />3. Work with contractor for information exchange on all aspects of <br />water quality, quantity. <br /> <br />4. Help develop alternative plans. <br /> <br />5. Review contractor prepared alternative plans. <br /> <br />6. Review contractor prepared designs and estimates. <br /> <br />7. Review contractor data from mapping, surveys, and topography, <br />if any. <br /> <br />8. Make recommendations to planning team concerning plan selec- <br />tion. <br /> <br />9. Review contractor's data base for developing feasibility plan. <br /> <br />Use of water subteam <br /> <br />l. Compile list of potential users of saline water. <br /> <br />2. Review contractor's plan for use of saline water. <br /> <br />3. <br /> <br />Help develop alternative plans. <br /> <br />~~ <br /> <br />l3 <br /> <br />GJICS7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.