My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03307
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:49:40 PM
Creation date
10/11/2006 11:39:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8277.600.10
Description
Big Sandy River Unit - Colorado River Salinity Control Program
State
WY
Basin
Colorado Mainstem
Date
1/1/1981
Title
Big Sandy River Unit Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER II <br /> <br />GENERAL APPROACH TO THE WORK <br /> <br />The team or any of the subteams will conduct investigations as necessary <br />and make recommendations to Water and Power for appropriate action. It will <br />seek public input into environmental scoping, alternative plan formulation and <br />evaluation, and recommended plan selection. It will provide input and recom- <br />mendations to the lead agency for feasibility report and environmental report <br />preparation and review those documents as discussed in Chapter V. It will be <br />the planning team which selects the recommended plan as discussed in Chapter <br />III. <br /> <br />Team leader responsibilities <br /> <br />l. Responsible for the formation of the planning team and sub- <br />teams. <br /> <br />2. Responsible for arranging and conducting planning team and <br />public meetings. <br /> <br />3. Responsible for publication and distribution of notices for <br />meetings, newsletters and summaries of planning team and <br />public meetings. <br /> <br />4. <br /> <br />Coordinates professional services contractor's actlv~t~es <br />with Water and Power, the planning team, and other study <br />participants. <br /> <br />ifY::} <br />\~~~/ <br /> <br />5. Coordinates scheduling and information for the preparation of <br />feasibility report appendices by technical personnel. <br /> <br />6. Acts as a contact for information throughout the study pro- <br />cess for the public as well as other agencies. <br /> <br />7. Insures that the study process follows the Principles and <br />Standards and pertinent Water and Power Instructions and <br />Po 1 icies. <br /> <br />8. Responsible to see that a recommended plan is selected ln <br />accordance with established instructions and policies. <br /> <br />Planning team and subteam responsibilities <br /> <br />Working Subteams <br /> <br />Planning team (composed of subteam leaders and team leader) <br /> <br />l. Attend planning team meetings and public meetings. <br /> <br />2. Conduct subteam meetings. <br /> <br />/ <br /> <br />3. <br /> <br />Develop alternative plans including nonstructural, and identify <br />water conservation opportunities which could be integrated into <br />alternative plans. <br /> <br />-- -',~~ <br /> <br />l2 <br /> <br />G~HC8o <br />
The URL can be used to link to this page
Your browser does not support the video tag.