Laserfiche WebLink
<br />" <br /> <br />"41~'1t ,') t;; ':' I'.' <br />. ~~~ "\~ <br /> <br />- 2 - <br /> <br />the District Engineer of the Geological Survey having charge <br /> <br />of stream-gaging operation in the region of said project; <br /> <br />and the Permittee shall advance the said Geological Survey <br /> <br />the amount of funds estimated to be necessary for such' co- <br /> <br />operation and supervision for such periods as may be mutually <br /> <br />agreed upon. The Permitttl8 shall keep accurate and suffi- <br /> <br />dent record of the foregoing determinations to the satis- <br /> <br />faction of the Commission, shall make return of such records <br /> <br />at the time of filing application for license and at such <br /> <br />other times as the' Cornndssion may require. and in such form <br /> <br />as the Commission may prescribe. <br /> <br />B. Sink such test pits or make such borings or other <br /> <br />foundation explorations and make such geologic studies and <br /> <br />tests on foundations and fill material as will make avail- <br /> <br />able sufficiemt information relating to character of founda-' <br /> <br />tions and materials for the projoct structures to permit of <br /> <br />the designing of the structures in accordan-::e .-lith good en- <br /> <br />gineering practice and the checking of their aafety, adEljUacy, <br /> <br />and desirability in tllli development of the resources involved. <br /> <br />C. Begin the required investigations within sixty days <br /> <br />after acceptance of the permit. and thereafter prosecute such <br /> <br />investigations in such manner and at such rate as in the judg- <br /> <br />ment'of the Commission will insure the completion of all nec- <br /> <br />essary investigations within the period of the permit. <br />