Laserfiche WebLink
<br />, , ' <br /> <br />1 ' , ' " <br />" . t., <br />, II, ,H~I' t:,,, , <br />... ~ .;:tJ ~ ~.~~ . '. u. <br /> <br />Form P-l <br /> <br />l"EDEllAL POWER COf1l1ISSION <br /> <br />TERMS AND CONDITIONS OF PRELIMINARY PERMIT <br /> <br />Article 1. The Permittee shall make such engineering and other <br /> <br />investigations, secure such data, and perform such acts as are neces- <br /> <br />sary in order to submit to the Commission as part of its application <br /> <br />for license such maps, plans, specifications, estimate of cost, and <br /> <br />, other information for a full Wlderstanding of the proposed project as <br /> <br />, <br /> <br />is required by the Conunission1s rules and regulations; and shall sup- <br /> <br />ply for the use of the Commission copies of engineering and geologic <br /> <br />reports and results of tentD and analyses, and any other information <br />- <br /> <br />secured in connection with such investigations, examinations, and sur- <br /> <br />veys when and as they are submitted to or completed by the Permittee. <br /> <br />In carrying out the requirements 01' this article the Permittee shall I <br /> <br />A. Install as soon as practicable and thereafter <br /> <br />maintain such stream gages and stream-gaging stations as <br />the District Engineer of the United States Geological Sur- <br /> <br />vey having charge of stream-gaging ,operations in the region <br /> <br />shall determine necessary and best adapted for the purpose <br /> <br />of determining the stage and flow of the stream or streams <br />from which water will 'be diverted, and shall provide for <br /> <br />required readings of ~uch gages and for the adequate rating <br /> <br />of such stream-gaging stations. The exact location, design, <br /> <br />and time of installation of gages and stations, the ratings <br /> <br />of such stations, and ~he determination of the flow thereat <br /> <br />shall be made under the supervision of or in cooperation with <br />