My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03265
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:41:08 PM
Creation date
10/11/2006 11:37:47 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.275
Description
Wild and Scenic-Flat Tops Wilderness Area
State
CO
Date
6/11/1973
Author
CRWCD
Title
Flat Tops Wilderness Area-Statement of the Colorado River Water Conservation District Before Senate Subcommittee on Public Lands Hearing on S 702 a Bill to Designate the Flat Tops Wilderness Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, JJi.~'H~~f~ II <br />.' d ,Ur.l r .. - <br /> <br />,PJoject No, 2647 <br /> <br />- 8 - <br /> <br />periodE of big game animals in the project area and observations <br />of fist resources during the same period. A copy of a report <br />on the study ~hall be filed wit'!, ",he Commission; this filing <br />:nay be m,de ;,y in'~l1Js ion of t" ' ,'.,port in the Exhi,bi t S of any <br />.3 ubseq\ ent application for lice~l~e. <br /> <br />Articl, 16. Permittee shall submit in triplicate at the close <br />of each three month period from the effective date of this per- <br />mit to the Regional Engineer, Federal Power Commission, Fort <br />Horth, Texas, who would have supervision over the project, or <br />to such other officer as the Commission may designate, accurate <br />detailed statements of the work accomplished during the period <br />and of the work planned for the ensuing three month period <br />under this permit. <br /> <br />Article 17, The Permittee shall for the purpose of facilita- <br />ting the consul~tion required by the terms of the permit, <br />designate a liaison officer to act for the Permittee in keeping <br />the appropriate Federal, State and local agencies currently <br />informed as to the progress of investigations during the term <br />of the permit. The identity and address of this liaison <br />officer shall be made known to such agencies within 60 days <br />from the date of issuance of this permit. <br /> <br />By the Commission. <br /> <br />( SEA L ) <br /> <br />" <br />//;,,-, , ' <br />, " / /' /1 <br />..I.~,-,/ <br />AA./ ,/ <br />'/ Kenneth F. Plumb <br />, . <br />i Secretary. <br /> <br />';{;? /~'L <br />
The URL can be used to link to this page
Your browser does not support the video tag.