<br />G\.lJ275
<br />
<br />NORFOLK UN IT
<br />
<br />LOCATION: Madison, stanton, Cuming and Dodge Counties with Irrigable Acres from Norfolk to Wisner
<br />SPONSORS: Elkhorn Val ley Water Resources Association and the Lower Elkhorn Watershed Planning Bd.
<br />FEATURES: Monterey Dam and Reservoir, Warnervi I Ie Diversion Works and Canals
<br />
<br />NORFOLK UNIT
<br />BUREAU of RECLAMATION
<br />
<br />CONSTRUCTION PERIOD:
<br />TOTAL ANNUAL COST:
<br />BENEFIT-COST RATIO:
<br />PROJECT ACREAGE:
<br />
<br />8 Years
<br />$2,214,400
<br />1.16to 1.00
<br />33,000 Acres
<br />
<br />T bl
<br />
<br />A
<br />
<br />PROJ ECT LI FE :
<br />ANNUAL O.M.&R.:
<br />COSTS BASED ON:
<br />
<br />100 Years
<br />$351,700
<br />1966 Prices
<br />
<br />
<br />A
<br />
<br />I P . t B fOt
<br />
<br /> a e - veraqe nnua rOlee ene I 5
<br /> IrrIOation Recreation Fish & Wi Idl ife Flood Control Total
<br />Direct Benefits $ 1,668,000 $ 693,000 $ 43,700 $ I 1,000 $ 2,4/5,700
<br />Indirect Benefits 163,000 -0- -0- -0- 163,000
<br />Tofal Benefits $ 1,831,000 $ 693,000 $ 43,700 $ 11,000 $ 2,578,700
<br />
<br /> Table 2 - pro:ect Costs and Renavrnent bv Source
<br /> 1rrlnatlon Recreation Fish & Wildlife Flood Contro I Total
<br />Share of
<br />Project Cost $41,910,000 $11,861,000 $ 956,000 $ 243,000 $ 54,970,000
<br />Amount Reimbur. 41,910,000 2,630,000 -0- -0- 44,540,000
<br />Non-reimbursable -0- $ 9,231,000 $ 956,000 $ 243,000 $ 10,430,000
<br />M.R.B.P. Not Avai lable -0- -0- -0- --
<br />Non-Federa I (State) -0- 2,630,000 -0- -0- 2,630,000
<br />Local Not Avallab Ie -0- -0- -0- --
<br />
<br />Table 3 - Avera e Annual Water R uirements
<br />
<br />rap Irrigation Requirement: 0.95 ac.ft./ac.
<br />Farm Del ivery Requirement: 1.38 ac.ft./ac.
<br />DIversion Requirement: 2.41 ac.ft./ac.
<br />Total Diversion Requirement: 74,600 ac.ft.
<br />Return Flow: Not Avai lable
<br />Streamflow Depletion: Not Available
<br />
<br />I
<br />i
<br />_ i THU~STQr:L-,
<br />L--
<br />
<br />CLkHOi'/rv
<br />
<br />WARNERVILLE
<br />DIVERSION DAM
<br />
<br />Table 4 - Dam and Reservoir Data
<br />Monterey Dam
<br />Height: 102 feet
<br />Spl I Iway Capacity:
<br />Ora I nage Area:
<br />Monterey Reservoir
<br />Capacity
<br />Flood Control
<br />Surcharge
<br />Conservation
<br />Sediment
<br />Total
<br />Area
<br />Surcharge
<br />Conservation
<br />*Excludes Surcharge
<br />
<br />~
<br />
<br />- [)ODGE -II
<br />BURT
<br />[WASHINGTON --
<br />I
<br />i
<br />
<br />Length: 10,100 ft.
<br />3,500 c.f.s.
<br />210 square mi les
<br />
<br />~
<br />
<br />Acre-Feet
<br />o
<br />38,700
<br />113,500
<br />5,000/50 yr
<br />211,100'
<br />Acres
<br />8,000
<br />7 300
<br />
<br />10,000/100 yr
<br />
<br />I I
<br />i
<br />
<br />LEGEND fa
<br />PROPOSED RESERVOIR il
<br />PROPOSED DIVERSION DAM -
<br />PROPOSED CANALS - - -
<br />PROPOSED IRRIGABLE AREA ~
<br />
<br />miles
<br />
<br />Feature
<br />
<br />Table 5 - Land Acquisition
<br />(acres)
<br />Fee Easement
<br />
<br />Total
<br />
<br />~'!"'Il If'['(;Y
<br />'\'1,'1'1)('1 v i II ('
<br />
<br />.
<br />
<br />
<br />,\~ [), dill',
<br />d Ii fIo: r',I, i lit i I"
<br />r'l'd j i (>II 'I('V('[, '(1.
<br />--- -
<br />),11,11 /'1111"
<br />
<br />'..)',
<br />
<br />o
<br />.
<br />
<br />6
<br />o
<br />
<br />12
<br />.
<br />
<br />18
<br />.
<br />
<br />24
<br />.
<br />
<br />1 ", ',{)U
<br />1,::(':(1
<br />I , ~;() I
<br />i,.'(i'
<br />1(1
<br />11!,1': :
<br />---1
<br />1 '.1'
<br />--.', ---!
<br />
|