My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ ... ,,-> <br /> <br />m <br />If) <br />.c:>_ .....t <br />{j) N <br /> <br />Units 1. 2, and 6 (Juniper Plan) (Continued) <br /> <br />Canals <br />Yellow Jacket <br />Initial capacity <br /> <br />... ...... ..... ......... .... <br /> <br />Length ..................................... <br />Josephine Basin <br /> <br />Initial capacity........................... <br /> <br />Length .................................... <br />Coal Creek <br /> <br />Initial capacity........................... <br /> <br />Length ..................................... <br />Lost Park Collection <br /> <br />Initial capacity............................ <br /> <br />I-lATER SUPPLY: <br /> <br />Diversion requirement (per irrigable acre) ....... <br />Increased water supply for irrigation annually... <br />Increased water supply for M&I annually.......... <br />Annual stream depletion by project ............... <br />Fish bypass October - March ...................... <br />Fish bypass April - September .................... <br /> <br />BENEFIT-COST ANALYSIS: (lOO-year period at 3 percent) <br /> <br />Average <br />annual benefits <br />Primary (direct) $1,536,400 <br />Secondary 611.400 <br />Total $2,147.800 <br /> <br />Average annual <br />equivalent costs <br />Project investment <br />OM&R <br />Share of CRSP costs <br />Total <br /> <br />BENEFIT-COST RATIOS: <br /> <br />Direct 1.40 <br />Total 1.95 <br /> <br />NET ANNUAL BENEFITS: <br /> <br />Direct benefits <br />Total benefits <br /> <br />$436.800 <br />$1,048.200 <br /> <br />500 CFS <br />15 mi. <br /> <br />300 CFS <br />39.5 mi. <br /> <br />175 CFS <br />18.5 mi. <br /> <br />100 CFS <br /> <br />3.50 A.F. <br />68,900 A.F. <br />55,000 A.F. <br />52,800 A.F1/ <br />30 CFSfI <br />70 CF5'=' <br /> <br />$ 904.000 <br />90.000 <br />105.600 <br />$1,099.600 <br /> <br />lJIf fish bypasses are increased to 65 second-feet and 100 <br />second-feet, then the M&I water delivered ~uld be reduced to 45,OqO <br />acre-feet annually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.