My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP03108
CWCB
>
Water Supply Protection
>
Backfile
>
3001-4000
>
WSP03108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:48:42 PM
Creation date
10/11/2006 11:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.J
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
2/1/1965
Title
Yellow Jacket Project Colorado: Plan Formulation Studies
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-- <br /> <br />~~~~J <br /> <br />o <br />(.:: <br />..... <br />CoJ <br /> <br />SUMMARY SHEET <br /> <br />YELLOW JACKET PROJECT. COLORADO <br /> <br />Unit 4 (Juniper Studies) <br /> <br />December 1964 <br /> <br />LOCATION: Westerly portiOn of ,\xial Basin and along the Yampa River <br />in the vicinity of Maybell. Colorado. <br /> <br />PLAN: This unit would provide storage at Juniper Reservoir for a <br />- <br />multi-purpose development; power. fishery. recreation. and the <br />irrigation of 18.239 acres. including 234 acres of supplemental <br />service and 18.005 full service acres in Axial Basin. The unit <br />would include the initial plan of development for the Juniper <br />Project as presented in the July 1963 report. thus providing <br />additional irrigation service to approKimately 9,000 acres of <br />full service land under the potential Sunbeam and Deadman Bench <br />Canals. <br /> <br />~: Construction Costs (Reconnaissance, subject to change) <br /> <br />Reservoirs <br /> <br />Juniper ...................................... <br />Jubb ......................................... <br /> <br />Canal <br />Deadmand Bench Canal .........~............... <br /> <br />Sunbeam Canal................................ <br />Axial Canal (East) ........................... <br />Powerplant and Switchyard ....................... <br />Transmission system ............................. <br />Axial pump plant ................................ <br />Laterals and drains ............................. <br />Recreational development ........................ <br />Total..................................... <br /> <br />WATER SUPPLY: <br /> <br />Diversion requirement (per irrigable acre) <br /> <br />Juniper area ................................. <br />Axial area ................................... <br /> <br />Increased water supply for irrigation annually.. <br />Juniper area ................................. <br />Axia 1 ar ea ................................... <br />Annual stream depletion ......................... <br /> <br />$15.332.000 <br />600,000 <br /> <br />1.780.,000 <br />760,000 <br />5,052.000 <br />9.520,000 <br />3.000.000 <br />2.689.000 <br />3.554.000 <br />788.000 <br />$43.075.000 <br /> <br />3.69 A.F. <br />3.50 A.F. <br />46.000 A.F. <br />53,800 A.F. <br />74.900 A.F. <br />
The URL can be used to link to this page
Your browser does not support the video tag.