Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />(1Q??2Z <br /> <br />IV. MITIGATING MEASURES IN THE PROPOSED ACTION <br /> <br />Many of the impacts mentioned in the previous section will be <br />mitigated because the project will be required to be in compliance <br />with all State, Federal, and Local laws as they pertain to the con- <br />struction of dams, spillways, reservoirs, and highways, prevention <br />of air and water pollution, protection of wildlife and vegetation, <br />provision of sanitary facilities, protection of property, restora- <br />tion of disturbed lands, protection of the public during construc- <br />tion, and relocation of residents. <br /> <br />Four families will be displaced by the project. These people <br />will be given assistance in relocating to new homes in the area if <br />they have need of such help. As much advance notice as possible <br />will be given to the residents before they are required to move. <br /> <br />Dust preventative measures, including wetting and spraying of <br />disturbed areas, will be followed. Upon completion of the project, <br />disturbed areas will be restored to their original contours as <br />closely as possible and will then be reseeded to native plants and <br />grasses. <br /> <br />During construction, disturbed lands subject to erosion from <br />storm runoff will be protected to the greatest extent possible by <br />temporary contouring. In addition, sediment control dams and ponds <br />wi'l be constructed downstream from the dam. <br /> <br />Burning of brush, trees, and grass from clearing operations <br />will be done only when atmospheric conditions are optimal and when <br />people will be least affected. There will be a continual clean-up <br />program to keep the grounds clear of trash and litter, as well as <br />a continual landscape maintenance program. <br /> <br />IV-l <br />