Laserfiche WebLink
<br />, <br />. <br /> <br />. <br /> <br />o <br />o <br />.... <br />w <br />w <br />--J <br /> <br />w <br />(f) <br />z <br />"' <br /> <br />x <br />"' <br /> <br />~ <br /> <br />z <br />w <br />2 <br />z <br />a: <br />. <br /> <br />-:l <br /> <br />r <br /> <br />" <br /> <br />C) <br />w <br />V <br />:J <br />o <br />o <br />a: <br />a. <br />"' <br />a: <br /> <br />. <br /> <br />I <br /> <br />Feasibility Reports <br /> <br />Feasibility reports are prepared pursuant to specific Congressional autho- <br />rization to determine the engineering, environmental and economic feasibil- <br />ity of adopting Federal projects or modifying existing projects for naviga- <br />tion, flood control, beach erosion control, and related water resource <br />developme&ts. Such studies determine the proper scale and scope of devel- <br />opments, the economic justification, and the equitable sharing of costs <br />and responsibilities by Federal and non-Federal interests. Alternative <br />solutions to the identified problems are formulated, and the National <br />Economic Development (NED) plan is identified. Upon completion, the re- <br />ports are submitted by the Chief of Engineers through the Secretary of <br />the Army to Congress for Congressional action. <br /> <br />Definite Plan Report <br /> <br />A definite plan report presents the findings and conclusions of such <br />further investigations as are necessary to determine the detailed plan of <br />development for a project. This report is usually completed during the <br />period between autllorization and the initiation of construction, and is <br />used primarily by the Bureau of Reclamation as the basic control for the <br />proper and orderly development of the project. <br /> <br />DEPARTMENT OF THE ARMY, Corps of Engineers <br /> <br />Reconnaissance Reports <br /> <br />Reconnaissance reports are prepared for both Detailed Project Reports <br />(DPRs) amd Feasibility Studies. Authority for the preparation of small <br />navigation, flood control, and beach erosion control reports (DPRs) is <br />delegated to the Secretary of the Army and the Chief of Engineers. DPR <br />studies and projects are not specifically authorized by Congress. They <br />are subject to limitations of the Federal cost for each individual pro- <br />ject and to the annual program for each type of project. Current limita- <br />tions are as follows: <br /> <br />Federal <br />Cost Limitation <br /> <br />Annual <br />Program Limit <br /> <br />Small Flocd Control <br />(Sec 205 1948 FCA) $ 4,000,000 <br /> <br />$ 30,000,000 <br /> <br />Small Navigation <br />(Sec 207 1960 R&H Act) 1,000,000 <br /> <br />25,000,000 <br /> <br />Small Beach Erosion <br />(Sec 103 1960 R&H Act) 1,000,000 <br /> <br />25,000,000 <br /> <br />The purpose for the reconnaissance report for small projects as well as <br />for those specifically authorized by Congress is to determine the need <br />for additional studies. This determination is based on the likelihood <br />of developing, through additional studies, an engineeringly feasible, <br />economically justified and environmentally acceptable project. A favor- <br />able Reconnaissance Study finding will result in the preparation of either <br />a DPR (under the small projects program) or a Feasibility Report (for <br />studies authorized by Congress), <br /> <br />ii <br /> <br />" <br />