Laserfiche WebLink
<br />East Slope - Colorado-Bit! Thompson Proiect <br /> <br />With a reasonable minimum inflow forecast on February 1, an above-normal supplemental <br />project water demand equal to 270,200 acre-feet can be expected on the Project for February <br />through September. Diversions through Adams Tunnel will be near 330 ft3/s during <br />February. Carter Lake storage will be at capacity of 112,200 acre-feet at the end of March. <br />~\dftn13 Tl2lmd ami Ol)ml'tl3 T1:Jjillel dLe.r'3ieftJ niB be. mininlirea rer 19 aa)3 awill.g /Lpril <br />to aee.Olilft16date the Feothil13 Pa nee Sy 3telil ftlatntenM.GG 3e.h.edulea ammg thi3 period. <br />Adams Tunnel and Olympus Tunnel diversions will ile iflerell3ea "hen the filMntenance iJ <br />eflml'letea lI!ld should run near the 550 Wls capacity of Adams Tunnel. Horsetooth <br />Reservoir will reach a maximum storage of IS9,HlO acre-feet by the end BfMa), which is <br />6;600 acre-feet below the reservoir capacity. <br /> <br />Approximately 68,919 acre-feet of carryover project water from the 1998 water year <br />Colorado-Big Thompson Project quota water allotment will be delive,red from Aprill through <br />July 15. <br /> <br />The inflow to Carter Lake and Horsetooth Reservoir will be regulated from June through <br />September to maintain reservoir storage at desirable levels and meet above-normal irrigation <br />demands. Irrigation demands will draft Horsetooth Reservoir storage to 56,209 acre-feet by <br />September 30, which is only 22,619 acre-feet below average. The end of water year storage <br />in Carter Lake ofJ5,eee acre-feet would be 19, He acre-feet below average. <br /> <br />filename: CBTA0P98,DFT <br /> <br />24 <br /> <br />Preliminaly WorIdns Draft July.. 1999 <br />