Laserfiche WebLink
<br />InjSum1094 <br /> <br />U.S.B.R. <br />DURANGO PROJECTS OFFICE <br />PARADOX VALLEY UNIT - CRBSCP <br /> <br />INJECTION SUMMARY <br />10/01/94-10/15/94 <br /> <br />(CONT) <br />Computation Std.'s <br /> <br />mg/L X [.001360] = ton/af <br />735.29 mg/L = 1 ton/af <br />*260,000 mg/L = 353.6 tons/af <br />400 gpm X 24 hr = 1.7678 af/day <br /> <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />70% Brine Injected = <br /> <br />7.414.300 aal = 22.76 af <br />7.48 gal/cf X 43,560 cf <br /> <br />100% Brine injected <br /> <br />6.83 a/f <br />15.93 a/f <br /> <br />Fresh water injected <br /> <br />Total salt removed: 15.93 af X 353.6 tons/af = 5,633 tons salt <br />injected 10/01/94 - 10/15/94 <br /> <br />5,633 t/15 days = 375.3 tons/day avg. injection <br /> <br />------------------------------------------------------------------ <br /> <br />note: approximate calculations indicate the following: <br /> <br />~80% annual plant factor [292 days of operation] ~ 400 gpm - <br />70% Brine would inject 127,000 tons of salt annually. <br /> <br />project goal is 180,000 tons of salt annually, the present mix <br />and rate of injection provides for 70% of project goal. <br /> <br />Annual Project Benifits based on $300/ton for these assumed <br />production rates are $38.~ <br /> <br />4 <br /> <br />001753 <br />