Laserfiche WebLink
<br />I . <br /> <br />InjSum1094 <br /> <br />U.S.B.R. <br />DURANGO PROJECTS OFFICE <br />PARADOX VALLEY UNIT - CRBSCP <br /> <br />INJECTION SUMMARY <br />10/01/94-10/15/94 <br /> <br />SUMMARY: <br /> <br />------------------------------------------------------------------ <br /> <br />Calendar Days <br />70% Brine Mix Injected ~ 400gpm <br />Max Pressure <br /> <br />15 Days <br />7,414,300 gal[22.76 af] <br />4,850 psi <br /> <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />Oct 1 - 15. <br />PD Pump A Run Time <br />PD Pump B Run Time <br />PD Pump C Run Time <br /> <br />8 hr <br />o hr <br />300 hr <br /> <br />------------------------------------------------------------------ <br /> <br />*Total PD Pump Run Time 308 hr [12.83 days] <br />Total Downtime 52 hr [ 2.17 davs] <br />Total time 360 hr [15 days] <br />Injection Plant Efficiency 308 hr = 85.6% <br /> 360 hr <br />*Corrected hour meter readings for power on / no pump rotation <br /> <br />------------------------------------------------------------------- <br /> <br />Startup/Shutdown Fresh Water <br />Brine Wellfield Totals <br />Well 2E <br />Well 3E <br />Well 4E <br />Well 5E <br />Well 7E <br />Well 8E <br />Well 9E <br />Well 11E <br />Well 12E <br />Well 13E <br /> <br />o gal <br /> <br />869,230 gal <br />828,990 gal <br />1,333,690 gal <br />1,379,910 gal <br />4,140 gal <br />6,140 gal <br />13,240 gal <br />754,130 gal <br />30 gal <br />510 gal <br /> <br />------------------------------------------------------------------- <br /> <br />Total Brine Diverted to Evap. Pond <br />Total Brine Injected <br />Total Fresh Injected <br /> <br />o gal <br />5,190,010 gal [15.93af] <br />2,224,290 gal [ 6.83af] <br /> <br />------------------------------------------------------------------- <br /> <br />Total Injected <br /> <br />7,414,300 gal [22.76af] <br /> <br />3 <br /> <br />001752 <br />