My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02937
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:46 PM
Creation date
10/11/2006 11:27:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.200
Description
Paradox Valley Unit - Colorado River Salinity Control Program
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
10/26/1994
Title
Paradox Valley Seismic Network: Observations to Date--October 26/ 1994
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />InjSum0994 <br /> <br />O.S.B.R. <br />DURANGO PROJECTS OFFICE <br />PARADOX VALLEY UNIT - CRBSCP <br /> <br />INJECTION SUMMARY <br />08/14/94-09/30/94 <br /> <br />ComDutation Std.'s <br /> <br />mg/L X [.001360] = ton/af <br />735.29 mg/L = 1 ton/af <br />*260,000 mg/L = 353.6 tons/af <br />400 gpm X 24 hr = 1.7678 af/day <br /> <br />------------------------------------------------------.------------ <br /> <br />70% Brine Injected = <br /> <br />22.415.400 qa1 = 68.80 af <br />7.48 ga1/cf X 43,560 cf <br /> <br />100% Brine injected <br /> <br />20.64 a/f <br />48.16 a/f <br /> <br />Fresh water injected <br /> <br />Total salt removed: 48.16 af X 353.6 tons/af = 17,029 tons salt <br />injected 08/14/94 - 09/30/94 <br /> <br />17,029 t/48 days = 354.8 tons/day avg.injection <br /> <br />------------------------------------------------------------------ <br /> <br />note: approximate calculations indicate the following: <br /> <br />~80% annual plant factor [292 days of operation] ~ 400 gpm - <br />70% Brine would inject 127,000 tons of salt annually. <br /> <br />proj ect goal is 180,000 tons of salt annually, the present mix <br />and rate of injection provides for 70% of project goal. <br /> <br />Annual Project Benifits based on $300/ton for these assumed <br />production rates are $38.~ <br /> <br />2 <br /> <br />001751 <br />
The URL can be used to link to this page
Your browser does not support the video tag.