My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02934
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02934
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:44:01 PM
Creation date
10/11/2006 11:27:08 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.200.60
Description
Basin Multi-State Organizations - Missouri River Basin Commission - Reports
Date
12/13/1973
Author
Fed. Subcommittee
Title
Federal Subcommittee Examinations of Issues Involving Municipal and Industrial Water Marketing from the Six Federal Reservoirs on the Missouri river
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(ADMINISTRATIVE USE ONLY) <br /> <br />Question 2 <br /> <br />How much water is available for industrial use in the long run? <br /> <br />The water supply of the Missouri River, as..regulated by the main <br />stem and tributary reservoir system, is adequate to meet all beneficial <br />consumptive uses which have been considered in any water resource <br />development plan considered to date, including the projected ultimate <br />use of up to 3 million acre feet of water annually for development of <br />the coal resources of the upper basin. Increased upstream depletions <br />result in reduction in power generation and in service to navigation, <br />but these reductions in service have always been expected under all <br />planning studies conducted to date and are acceptable. <br /> <br />The maximum amount of water which can be made available to <br />serve upstream beneficial consumptive uses has not been determined, but <br />exceeds the 11.5 million acre feet of depletions (1949-2020) considered <br />in the Framework study. Even with depletions of this magnitude, partial <br />service to navigation could be maintained. The limit of depletions which <br />could be served would be reached only when water availability for navi- <br />gation reduces to zero, under the provisions of the O'Mahoney-Millikin <br />Amendment to the 1944 Flood Control Act. <br /> <br />The Missouri River Basin Commission is currently updating the 1969 <br />Framework study. This and other studies and developments in the Basin <br />over time will permit more specific determinations of water uses and <br />requirements. <br /> <br />~ <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.