My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02905
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:47:36 PM
Creation date
10/11/2006 11:26:14 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.913
Description
South Platte Projects - Foothills/Windy Gap
State
CO
Basin
South Platte
Date
1/1/1974
Author
Unknown
Title
Foothills Project Overview and Maps
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OULlet Capacity - 4000 cubic n. /second <br />Spil1\\'3}. Capacity - 90,000. cubic ft. /sccond <br />Tunnel Intakes - multilevel tower <br />Capacity - 1100 cu. ft. /sec. (750 mgd) <br /> <br />2. Foothills T\.:nnel and Condo =2(, . <br />I)"pe -- Pressure, concrete and steel lined <br />Length - 1 S, 000 ft. <br />Diameter - 10'.6" <br />Capacity - 1160 cu. ft. /sec. (750 mgd) <br />Condo ~26 - 1700 ft. -- 10'-6" diam. steel <br /> <br />3. Treatment Plant <br />Type -- rapid mechanical <br />Capacity - 125 million gallons per day. 1st unit <br />500 million gallons per day - ultimate (incremental additions) <br />,Structures - <br />Headworks - <br />. Control of inflow to treatment plant <br />~ Hydro-power generation <br />Chemical Building - <br />Chemical storage <br />- Chemical feeds <br />- Chemical mix,ng <br />- Inflow metering <br />Electrical power center <br />.~ <br />Plant pumping " <br />Flocculation and Sedimentation Basin - '125 mgd <br />- Flocculation equipment <br />- Continuous sludge removal <br />Filter Building , <br />- 8 dual media filter units - 125 mgd <br />- Settled water, wash water, effluent water piping and valves <br />Clear Water Storage .. <br />- Two underground concrete reservoirs <br />- Capacity - 25 million gallons each <br />Chlorine and Ammonia Storage Bldg. <br />. Ch10r ine storage <br />- Tank trailers <br />- I ton cylinder s <br />. Steel tanks aqua ammonia storage <br />Control Build ing - <br />- Plant offices <br />Visitors center <br />- Plant control <br />- Compute r <br />- Laboratory <br />- Op'erating pe'rsonne1 facilities <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.