Laserfiche WebLink
<br />Wastc Disposal Facilities - <br />_ Washwatcr rcco,.cry basins and pumps <br />- Ovcrflow holding pond <br />- Slud~e pumping <br />Sludge drying basins <br />- 15 acres on sitc <br />Sludge disposal <br />. - Land !ill - limestone pits in ,.icinity <br /> <br />4. Aurora Raw 'Vater Interconnection <br /> <br />_ 4000 ft. - 60-inch and 54- inch conduit, val ving and metering <br /> <br />5. Access Roads - <br /> <br />- County roads to treatment plant <br />- 'Platte Canyon Road to dam and tunnel. (improvements) <br />- New road to right abutment of dam <br /> <br />6. Conduit No. 27 <br /> <br />- 53,000 It. - 108" diam. to Highlands Rescrvoir <br />- 39,000 It. - 90" diam. Highlands Reservoir <br />to Hillcrest Reservoir <br /> <br />'. <br /> <br />. <br />. <br /> <br />The estimated cost of the Foothills Project is as follows: <br /> <br />1. Strontia Springs Dam and Reservoir <br /> <br />$ 18,000,000 <br /> <br />2. Foothills Tunnel and Conduit No; 26 <br /> <br />14,000,000 <br /> <br />3. Foothills Treatment Plant <br /> <br />38,000,000 <br /> <br />4. Aurora Raw Water Interconnection <br /> <br />600,000 <br /> <br />5. Access Roads <br /> <br />2,600,000 <br /> <br />6. ConduIt No. 27 <br /> <br />32,800,000 <br /> <br />Total <br /> <br />$106,000,000 <br />