Laserfiche WebLink
<br />- .-..- , <br />110 . ." i <br />"'.... <br /> <br />10 <br /> <br />METROPOLITAN WATER DISTRICT <br /> <br />one pump per plant until April 4, 1948, with the exception of tW(} <br />short periods early in January when pumping was interrupted ro <br />permit necessary repairs to the Eagle Mountain and Lakeview <br />siphons, and on March 28, when pumping was discontinued to per- <br />mit the Southern California Edison Company to complete the instal- <br />lation of carrier current load control equipment at Hayfield_ From <br />April 4 until June 10, 1948, two pumps per plant were operated, <br />bringing the Lake Mathews storage up to the desired maximum of <br /> <br />TABLE 2 <br /> <br />MAIN AQUEDUCT FEATURES <br /> <br />Jun. 30, 1948 <br /> <br />F~ATURE <br /> <br />Preliminary expense.. <br />Right of way, lands, and easements.. <br />Roads ... m.. ..... ......153 <br />Construction water svstem... ..180 <br />Construction power system.. ......... 477 <br />Parker Dam.. ..m.... <br />Tunnels, concrete lined <br />Cut-and-cover conduits.. <br />Concrete lined canals.. <br />Unlined canal.... <br />Siphons on ,. <br />Telephone lines <br />Transmission lines. . <br />Pumping plants and four camps.. <br />Gene and Copper Basin reservoirs.. <br />Miscellaneous .... <br /> <br />miles <br />miles <br />miles <br /> <br />....92.09 miles <br />....54.45 miles <br />......62.81 miles <br />..1.05 miles <br />...28.53 miles <br />..........438 miles <br />....240 miles <br /> <br />Totals <br />Grand total.... <br />Deduct: <br />Public Works Administration grant for <br />Parker Dam.. ..m.. . m....... <br />Defense Plant Corporation for ground <br />wires on transmission lines.. ....m....... .... <br />Salvage sales and undistributed overhead.. <br />Cash discounts on <br />Unapplied workmen's comp~nsation.. <br />Liquidated damages. <br /> <br />Totals n <br />Grand total deductions.. <br />Net cost to June 3D, 1948.. <br /> <br />Add: <br />Estimated cost of half of Parker power <br />plant after credit for use of two Dis- <br />tricl units by U. S... ................... <br /> <br />$ 4,6:13.660.07 <br />1,3:13,416_70 <br />1.057.001.45 <br />823,035.44 <br />1,331.043_18 <br />7.239.927_34 <br />70.288.162.99 <br />14.115,469.66 <br />7.746,711.52 <br />143,324_37 <br />9,828,207,89 <br />364.248_24 <br />2,716.322.45 <br />15,904,796.16 <br />1,056,548.23 <br />2,279.795_12 <br /> <br />$140,861.670_81 $336,232_97 <br /> <br />$141.197,903.78 <br /> <br />ORIGINAL COST <br /> <br />ADDITIONS <br />AND <br />BETTERMENTS <br /> <br />$ 85.000.00 <br />201.259.36 <br /> <br />8,920.99 <br />8,242.24 <br />32.810_38 <br /> <br />$ 600,000.00 <br /> <br />253,261.37 <br />2.183,093_51 <br />253.258_74 <br />797,538_04 <br />6II.I05_29 <br /> <br />$ 4,698,256.95 $ 2,923.61 <br />$ 4,701,180_56 <br />$136,496,723.22 <br /> <br />$ 2,923_51 <br /> <br />$ 3.300,000.00 <br />