My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02753
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02753
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:45:45 PM
Creation date
10/11/2006 11:19:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
10/19/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />, <br /> <br /> <br />\ <br />l~' <br />~~ ~ <br />J <br />\J <br />. <br /> <br />o 0 1 G II It <br /> <br />. <br /> <br />. <br /> <br />above the level required to allow work to continue on the upatrcam <br /> <br />end of the Navajo Indian Irrigation tunnel. <br /> <br />General Investi~ations <br /> <br />Feasibility Investi~ations <br /> <br />The ANIMAS-LA PLATA feasibility report was transmitted to the Bureau <br />of the Budget on April 10, 1964, to obtain views of that agency relative <br /> <br />to submittal of the report to Congress. <br /> <br />The OOLORES PROJECT feasibility report was transmitted to the Bureau <br /> <br />of the Budget on September 22, 1965, to obtain views of that agency <br /> <br />relative to submittal of the report to Congress. <br /> <br />The Ute Mountain Tribal Council on July 21, 1965, passed a reso- <br /> <br />lution to participate in the Animas-La Plata and Dolores Projects. <br /> <br />The proposed feasibility report for the DALLAS CREEK PROJECT has <br /> <br />been reviewed by the Commissioner and Chief Engineer. The report has <br /> <br />been distributed to Federal, State, and local agencies for formal review. <br /> <br />Feasibility designs and estimates on the WEST DIVIDE PROJECT are <br /> <br />completed except for review by the Chief Engineer. Preparation of <br /> <br />appendixes and writing 01' the proposed feasibility report arc in progress. <br /> <br />The report is scheduled to be completed by the end 01' this calendar year, <br /> <br />On the SAN MIGUEL PROJECT, feasibility designs and estimates have <br /> <br />been completed. Financial and economic analyses studies and preparation <br /> <br />of the proposed feasibility report are in progress. The proposed report <br /> <br />is scheduled to be completed by the end of this calendar year to be <br />available for consideration by the State 01' Colorado. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.