My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02742
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:40 PM
Creation date
10/11/2006 11:19:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1968
Author
PSIAC
Title
Quarterly Reports for Colorado and California - 68-1 through 68-4 Meetings
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />G01759 <br /> <br />Advance Planninq <br /> <br />The Definite Plan Report for the Fruitland Mesa Project <br />near Hotchkiss has been completed and approved by the Commissioner. <br />Preconstruct ion investigations have been in progress since issuance <br />of the Definite Plan Report. Specification surveys have been <br />completed for the Gould Canal structures and structure designs have <br />been initiated. Studies are now underway to determine the final <br />location for the proposed Fruitland Mesa Canal diversion dam. The <br />Commissioner of Reclamation's Office has approved a preliminary draft <br />of the project repayment contract, and contract negotiations will <br />begin with the Fruitland Mesa Conservancy District in the near future. <br /> <br />CWCB/LDM/mm - 8-20-68 <br /> <br />-3- <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.